Description of the power plant
Ground-based solar power plant PV Plant Yarove 2 Stage is located in south part of Ukraine - Tarutynskyi district, Odeska region, Ukraine. The power plant is putted into operation on 2018 with installed capacity- 1.19 MW. Ltd "Tarutyne Solar 4" is a legal entity operating the power plant. It obtained the license for electricity generation on July 17, 2018 and permitted for the Feed-in-tariff in hryvnias equivalent of 15.03 eurocents starting from December 14, 2018.
Putted into opperation
Nov 2018
Installed capacity
1.19 MW
DCFeed-in-Tariff
15.03¢
Location
Key Indicators
Capacity Factor
The unitless ratio of an actual electrical energy output over a given period of time to the maximum possible electrical energy output over that period.
Irradiation
Average annual sum of global irradiation per square meter received by the modules of the given system based on satellite data (kWh/m2)
Tariff
Tariff established by NERC
(eurocents/KWh)
Contractors
Designer
LTD "VSEM"General contractor
LTD "VSEM"Additional information
In a paid subscription, you can additionally find answers to the following questions:
- What phone and email for contacts with PV Plant Yarove 2 Stage?
- What group of companies does the PV Plant Yarove 2 Stage belong to?
- Who are the beneficial owners of PV Plant Yarove 2 Stage?
- What is the insolation at PV Plant Yarove 2 Stage?
- What is the current tariff in UAH for PV Plant Yarove 2 Stage?
- Is there a local component bonus for PV Plant Yarove 2 Stage and what is its size
- What is the capacity factor of PV Plant Yarove 2 Stage?
- What is the monthly electricity production of PV Plant Yarove 2 Stage?
- What is the annual revenue of PV Plant Yarove 2 Stage?
- What market share does PV Plant Yarove 2 Stage have in the Ukrainian renewable energy market in terms of capacity, production and revenue?
- What was the capital expenditure cost for PV Plant Yarove 2 Stage?
- Which company designed the project for PV Plant Yarove 2 Stage?
- Which company was the general contractor for PV Plant Yarove 2 Stage?
- What generating equipment (solar panels and inverters) is installed in PV Plant Yarove 2 Stage?
- What is the size of the land plot on which PV Plant Yarove 2 Stage is located?
- What are the cadastral numbers of the parcels on which PV Plant Yarove 2 Stage is located?
- What are the exact coordinates of the location of PV Plant Yarove 2 Stage?
- When were the grid connection specification forPV Plant Yarove 2 Stage issued and what capacity was approved in the specification?
In addition, with a paid subscription, you can familiarize yourself with the available permits for PV Plant Yarove 2 Stage
- Land allocation documentationPV Plant Yarove 2 Stage
- Construction permits and declarative documentationPV Plant Yarove 2 Stage
- Environmental Impact Assessment (EIA) DocumentsPV Plant Yarove 2 Stage
- Feed-In-Tariff Setting DocumentsPV Plant Yarove 2 Stage
The presented list reflects the directions in which information on assets is collected. On the PV Plant Yarove 2 Stage some of this information may not yet be available, however, work is underway to collect the missing information and expand the amount of information provided to customers of a subscription.
Have ideas to improve energo.ua?
Energo.ua project is dedicated to add transparancy to Ukrainian renewable energy market.