Description of the power plant
Ground-based solar power plant PV Plant Yasenivka 1 Stage is located in west part of Ukraine - Yarmolynetskyi district, Khmelnytska region, Ukraine. The power plant is putted into operation on 2013 with installed capacity- 0.49 MW. Ltd "Ekotekhnik-Yarmolyntsi" is a legal entity operating the power plant. It obtained the license for electricity generation on June 13, 2013 and permitted for the Feed-in-tariff in hryvnias equivalent of 33.93 eurocents starting from August 22, 2013.
Putted into opperation
Jun 2013
Installed capacity
0.49 MW
DCFeed-in-Tariff
33.93¢
Location
Key Indicators
Capacity Factor
The unitless ratio of an actual electrical energy output over a given period of time to the maximum possible electrical energy output over that period.
Irradiation
Average annual sum of global irradiation per square meter received by the modules of the given system based on satellite data (kWh/m2)
Tariff
Tariff established by NERC
(eurocents/KWh)
Equipment
Type | Manufacturer | Model | ||
---|---|---|---|---|
Trina Solar | TSM-245 PS05 | |||
SMA | SMC-11000 TLFRP |
Additional information
In a paid subscription, you can additionally find answers to the following questions:
- What phone and email for contacts with PV Plant Yasenivka 1 Stage?
- What group of companies does the PV Plant Yasenivka 1 Stage belong to?
- Who are the beneficial owners of PV Plant Yasenivka 1 Stage?
- What is the insolation at PV Plant Yasenivka 1 Stage?
- What is the current tariff in UAH for PV Plant Yasenivka 1 Stage?
- Is there a local component bonus for PV Plant Yasenivka 1 Stage and what is its size
- What is the capacity factor of PV Plant Yasenivka 1 Stage?
- What is the monthly electricity production of PV Plant Yasenivka 1 Stage?
- What is the annual revenue of PV Plant Yasenivka 1 Stage?
- What market share does PV Plant Yasenivka 1 Stage have in the Ukrainian renewable energy market in terms of capacity, production and revenue?
- What was the capital expenditure cost for PV Plant Yasenivka 1 Stage?
- Which company designed the project for PV Plant Yasenivka 1 Stage?
- Which company was the general contractor for PV Plant Yasenivka 1 Stage?
- What generating equipment (solar panels and inverters) is installed in PV Plant Yasenivka 1 Stage?
- What is the size of the land plot on which PV Plant Yasenivka 1 Stage is located?
- What are the cadastral numbers of the parcels on which PV Plant Yasenivka 1 Stage is located?
- What are the exact coordinates of the location of PV Plant Yasenivka 1 Stage?
- When were the grid connection specification forPV Plant Yasenivka 1 Stage issued and what capacity was approved in the specification?
In addition, with a paid subscription, you can familiarize yourself with the available permits for PV Plant Yasenivka 1 Stage
- Land allocation documentationPV Plant Yasenivka 1 Stage
- Construction permits and declarative documentationPV Plant Yasenivka 1 Stage
- Environmental Impact Assessment (EIA) DocumentsPV Plant Yasenivka 1 Stage
- Feed-In-Tariff Setting DocumentsPV Plant Yasenivka 1 Stage
The presented list reflects the directions in which information on assets is collected. On the PV Plant Yasenivka 1 Stage some of this information may not yet be available, however, work is underway to collect the missing information and expand the amount of information provided to customers of a subscription.
Have ideas to improve energo.ua?
Energo.ua project is dedicated to add transparancy to Ukrainian renewable energy market.