Description of the power plant
Rooftop solar power plant Rooftop PV Dnister Elektro is located in west part of Ukraine - Ternopilska city council, Ternopilska region, Ukraine. The power plant is putted into operation on 2019 with installed capacity- 0.18 MW. Ltd "Dnister-Elektro" is a legal entity operating the power plant. It obtained the license for electricity generation on February 22, 2019 and permitted for the Feed-in-tariff in hryvnias equivalent of 16.37 eurocents starting from October 24, 2019.
Putted into opperation
Oct 2019
Installed capacity
0.18 MW
DCFeed-in-Tariff
16.37¢
Location
Key Indicators
Capacity Factor
The unitless ratio of an actual electrical energy output over a given period of time to the maximum possible electrical energy output over that period.
Irradiation
Average annual sum of global irradiation per square meter received by the modules of the given system based on satellite data (kWh/m2)
Tariff
Tariff established by NERC
(eurocents/KWh)
Contractors
Designer
LTD "EKOTEKHNIK UKRAYINA"General contractor
LTD "EKOTEKHNIK UKRAYINA"Additional information
In a paid subscription, you can additionally find answers to the following questions:
- What phone and email for contacts with Rooftop PV Dnister Elektro?
- What group of companies does the Rooftop PV Dnister Elektro belong to?
- Who are the beneficial owners of Rooftop PV Dnister Elektro?
- What is the insolation at Rooftop PV Dnister Elektro?
- What is the current tariff in UAH for Rooftop PV Dnister Elektro?
- Is there a local component bonus for Rooftop PV Dnister Elektro and what is its size
- What is the capacity factor of Rooftop PV Dnister Elektro?
- What is the monthly electricity production of Rooftop PV Dnister Elektro?
- What is the annual revenue of Rooftop PV Dnister Elektro?
- What market share does Rooftop PV Dnister Elektro have in the Ukrainian renewable energy market in terms of capacity, production and revenue?
- What was the capital expenditure cost for Rooftop PV Dnister Elektro?
- Which company designed the project for Rooftop PV Dnister Elektro?
- Which company was the general contractor for Rooftop PV Dnister Elektro?
- What generating equipment (solar panels and inverters) is installed in Rooftop PV Dnister Elektro?
- What is the size of the land plot on which Rooftop PV Dnister Elektro is located?
- What are the cadastral numbers of the parcels on which Rooftop PV Dnister Elektro is located?
- What are the exact coordinates of the location of Rooftop PV Dnister Elektro?
- When were the grid connection specification forRooftop PV Dnister Elektro issued and what capacity was approved in the specification?
In addition, with a paid subscription, you can familiarize yourself with the available permits for Rooftop PV Dnister Elektro
- Land allocation documentationRooftop PV Dnister Elektro
- Construction permits and declarative documentationRooftop PV Dnister Elektro
- Environmental Impact Assessment (EIA) DocumentsRooftop PV Dnister Elektro
- Feed-In-Tariff Setting DocumentsRooftop PV Dnister Elektro
The presented list reflects the directions in which information on assets is collected. On the Rooftop PV Dnister Elektro some of this information may not yet be available, however, work is underway to collect the missing information and expand the amount of information provided to customers of a subscription.
Have ideas to improve energo.ua?
Energo.ua project is dedicated to add transparancy to Ukrainian renewable energy market.