Description of the power plant
Hydroelectric power plant Sednivska HPP is located in north part of Ukraine - Chernihivskyi district, Chernihivska region, Ukraine. The power plant is putted into operation on 1957 with installed capacity- 0.18 MW. Ltd "Yedynyy Enerhostandart" is a legal entity operating the power plant. It obtained the license for electricity generation on August 14, 2018 and permitted for the Feed-in-tariff in hryvnias equivalent of 17.45 eurocents starting from January 11, 2019.
Putted into opperation
Dec 1957
Installed capacity
0.18 MW
Feed-in-Tariff
17.45¢
Location
Key Indicators
Capacity Factor
The unitless ratio of an actual electrical energy output over a given period of time to the maximum possible electrical energy output over that period.
Installed capacity
Installed capacity of the power plant (MW)
Tariff
Tariff established by NERC
(eurocents/KWh)
Additional information
In a paid subscription, you can additionally find answers to the following questions:
- What phone and email for contacts with Sednivska HPP?
- What group of companies does the Sednivska HPP belong to?
- Who are the beneficial owners of Sednivska HPP?
- What is the current tariff in UAH for Sednivska HPP?
- Is there a local component bonus for Sednivska HPP and what is its size
- What is the capacity factor of Sednivska HPP?
- What is the monthly electricity production of Sednivska HPP?
- What is the annual revenue of Sednivska HPP?
- What market share does Sednivska HPP have in the Ukrainian renewable energy market in terms of capacity, production and revenue?
- What was the capital expenditure cost for Sednivska HPP?
- Which company designed the project for Sednivska HPP?
- Which company was the general contractor for Sednivska HPP?
- What is the size of the land plot on which Sednivska HPP is located?
- What are the cadastral numbers of the parcels on which Sednivska HPP is located?
- What are the exact coordinates of the location of Sednivska HPP?
- When were the grid connection specification forSednivska HPP issued and what capacity was approved in the specification?
In addition, with a paid subscription, you can familiarize yourself with the available permits for Sednivska HPP
- Land allocation documentationSednivska HPP
- Construction permits and declarative documentationSednivska HPP
- Environmental Impact Assessment (EIA) DocumentsSednivska HPP
- Feed-In-Tariff Setting DocumentsSednivska HPP
The presented list reflects the directions in which information on assets is collected. On the Sednivska HPP some of this information may not yet be available, however, work is underway to collect the missing information and expand the amount of information provided to customers of a subscription.
Have ideas to improve energo.ua?
Energo.ua project is dedicated to add transparancy to Ukrainian renewable energy market.