Description of the power plant
Onshore wind farm Syvaska Wind Farm 2 Stage 12 Phase is located in south part of Ukraine - Chaplynskyi district, Khersonska region, Ukraine. The power plant is putted into operation on 2020 with installed capacity- 23.4 MW. Ltd "Syvashenerhoprom" is a legal entity operating the power plant. It obtained the license for electricity generation on July 12, 2012 and permitted for the Feed-in-tariff in hryvnias equivalent of 8.82 eurocents starting from January 20, 2021.
Putted into opperation
Dec 2020
Installed capacity
23.4 MW
Feed-in-Tariff
8.82¢
Location
Key Indicators
Capacity Factor
The unitless ratio of an actual electrical energy output over a given period of time to the maximum possible electrical energy output over that period.
Wind speed
Average annual wind speed for 10% windiest areas in 10 km area around wind farm location based on satellite data (m/s)
Tariff
Tariff established by NERC
(eurocents/KWh)
Contractors
Designer
TOV" VKN UKRAYINA"General contractor
POWER CONSTRUCTION CORPORATION OF CHINA, LTDAdditional information
In a paid subscription, you can additionally find answers to the following questions:
- What phone and email for contacts with Syvaska Wind Farm 2 Stage 12 Phase?
- What group of companies does the Syvaska Wind Farm 2 Stage 12 Phase belong to?
- Who are the beneficial owners of Syvaska Wind Farm 2 Stage 12 Phase?
- What is the wind speed at Syvaska Wind Farm 2 Stage 12 Phase?
- What is the current tariff in UAH for Syvaska Wind Farm 2 Stage 12 Phase?
- Is there a local component bonus for Syvaska Wind Farm 2 Stage 12 Phase and what is its size
- What is the capacity factor of Syvaska Wind Farm 2 Stage 12 Phase?
- What is the monthly electricity production of Syvaska Wind Farm 2 Stage 12 Phase?
- What is the annual revenue of Syvaska Wind Farm 2 Stage 12 Phase?
- What market share does Syvaska Wind Farm 2 Stage 12 Phase have in the Ukrainian renewable energy market in terms of capacity, production and revenue?
- What was the capital expenditure cost for Syvaska Wind Farm 2 Stage 12 Phase?
- Which company designed the project for Syvaska Wind Farm 2 Stage 12 Phase?
- Which company was the general contractor for Syvaska Wind Farm 2 Stage 12 Phase?
- What generating equipment (wind turbines) is installed in Syvaska Wind Farm 2 Stage 12 Phase?
- What is the size of the land plot on which Syvaska Wind Farm 2 Stage 12 Phase is located?
- What are the cadastral numbers of the parcels on which Syvaska Wind Farm 2 Stage 12 Phase is located?
- What are the exact coordinates of the location of Syvaska Wind Farm 2 Stage 12 Phase?
- When were the grid connection specification forSyvaska Wind Farm 2 Stage 12 Phase issued and what capacity was approved in the specification?
In addition, with a paid subscription, you can familiarize yourself with the available permits for Syvaska Wind Farm 2 Stage 12 Phase
- Land allocation documentationSyvaska Wind Farm 2 Stage 12 Phase
- Construction permits and declarative documentationSyvaska Wind Farm 2 Stage 12 Phase
- Environmental Impact Assessment (EIA) DocumentsSyvaska Wind Farm 2 Stage 12 Phase
- Feed-In-Tariff Setting DocumentsSyvaska Wind Farm 2 Stage 12 Phase
The presented list reflects the directions in which information on assets is collected. On the Syvaska Wind Farm 2 Stage 12 Phase some of this information may not yet be available, however, work is underway to collect the missing information and expand the amount of information provided to customers of a subscription.
Have ideas to improve energo.ua?
Energo.ua project is dedicated to add transparancy to Ukrainian renewable energy market.