Description of the power plant
Biomass power plant TPP Ivankiv is located in north part of Ukraine - Ivankivskyi district, Kyivska region, Ukraine. The power plant is putted into operation on 2014 with installed capacity- 19.0 MW. Ltd "Biohazenerho" is a legal entity operating the power plant. It obtained the license for electricity generation on November 21, 2013 and permitted for the Feed-in-tariff in hryvnias equivalent of 12.39 eurocents starting from November 28, 2013.
Putted into opperation
Jun 2014
Installed capacity
19.0 MW
Feed-in-Tariff
12.39¢
Location
Key Indicators
Capacity Factor
The unitless ratio of an actual electrical energy output over a given period of time to the maximum possible electrical energy output over that period.
Installed capacity
Installed capacity of the power plant (MW)
Tariff
Tariff established by NERC
(eurocents/KWh)
Contractors
Designer
PJSC "AK"SATER"General contractor
LTD "TM BUD"Additional information
In a paid subscription, you can additionally find answers to the following questions:
- What phone and email for contacts with TPP Ivankiv?
- What group of companies does the TPP Ivankiv belong to?
- Who are the beneficial owners of TPP Ivankiv?
- What is the current tariff in UAH for TPP Ivankiv?
- Is there a local component bonus for TPP Ivankiv and what is its size
- What is the capacity factor of TPP Ivankiv?
- What is the monthly electricity production of TPP Ivankiv?
- What is the annual revenue of TPP Ivankiv?
- What market share does TPP Ivankiv have in the Ukrainian renewable energy market in terms of capacity, production and revenue?
- What was the capital expenditure cost for TPP Ivankiv?
- Which company designed the project for TPP Ivankiv?
- Which company was the general contractor for TPP Ivankiv?
- What is the size of the land plot on which TPP Ivankiv is located?
- What are the cadastral numbers of the parcels on which TPP Ivankiv is located?
- What are the exact coordinates of the location of TPP Ivankiv?
- When were the grid connection specification forTPP Ivankiv issued and what capacity was approved in the specification?
In addition, with a paid subscription, you can familiarize yourself with the available permits for TPP Ivankiv
- Land allocation documentationTPP Ivankiv
- Construction permits and declarative documentationTPP Ivankiv
- Environmental Impact Assessment (EIA) DocumentsTPP Ivankiv
- Feed-In-Tariff Setting DocumentsTPP Ivankiv
The presented list reflects the directions in which information on assets is collected. On the TPP Ivankiv some of this information may not yet be available, however, work is underway to collect the missing information and expand the amount of information provided to customers of a subscription.
Have ideas to improve energo.ua?
Energo.ua project is dedicated to add transparancy to Ukrainian renewable energy market.