Description of the power plant
Ground-based solar power plant Tsekynivska PV Plant 2 3 Stage is located in east part of Ukraine - Yampilskyi district, Vinnytska region, Ukraine. The power plant is putted into operation on 2013 with installed capacity- 2.5 MW. Fea "Novosvit" is a legal entity operating the power plant. It obtained the license for electricity generation on December 28, 2011 and permitted for the Feed-in-tariff in hryvnias equivalent of 46.53 eurocents starting from March 25, 2013.
Putted into opperation
Mar 2013
Installed capacity
2.5 MW
DCFeed-in-Tariff
46.53¢
Location
Key Indicators
Capacity Factor
The unitless ratio of an actual electrical energy output over a given period of time to the maximum possible electrical energy output over that period.
Irradiation
Average annual sum of global irradiation per square meter received by the modules of the given system based on satellite data (kWh/m2)
Tariff
Tariff established by NERC
(eurocents/KWh)
Contractors
Designer
LTD "VSEM"General contractor
LTD "VSEM"Additional information
In a paid subscription, you can additionally find answers to the following questions:
- What phone and email for contacts with Tsekynivska PV Plant 2 3 Stage?
- What group of companies does the Tsekynivska PV Plant 2 3 Stage belong to?
- Who are the beneficial owners of Tsekynivska PV Plant 2 3 Stage?
- What is the insolation at Tsekynivska PV Plant 2 3 Stage?
- What is the current tariff in UAH for Tsekynivska PV Plant 2 3 Stage?
- Is there a local component bonus for Tsekynivska PV Plant 2 3 Stage and what is its size
- What is the capacity factor of Tsekynivska PV Plant 2 3 Stage?
- What is the monthly electricity production of Tsekynivska PV Plant 2 3 Stage?
- What is the annual revenue of Tsekynivska PV Plant 2 3 Stage?
- What market share does Tsekynivska PV Plant 2 3 Stage have in the Ukrainian renewable energy market in terms of capacity, production and revenue?
- What was the capital expenditure cost for Tsekynivska PV Plant 2 3 Stage?
- Which company designed the project for Tsekynivska PV Plant 2 3 Stage?
- Which company was the general contractor for Tsekynivska PV Plant 2 3 Stage?
- What generating equipment (solar panels and inverters) is installed in Tsekynivska PV Plant 2 3 Stage?
- What is the size of the land plot on which Tsekynivska PV Plant 2 3 Stage is located?
- What are the cadastral numbers of the parcels on which Tsekynivska PV Plant 2 3 Stage is located?
- What are the exact coordinates of the location of Tsekynivska PV Plant 2 3 Stage?
- When were the grid connection specification forTsekynivska PV Plant 2 3 Stage issued and what capacity was approved in the specification?
In addition, with a paid subscription, you can familiarize yourself with the available permits for Tsekynivska PV Plant 2 3 Stage
- Land allocation documentationTsekynivska PV Plant 2 3 Stage
- Construction permits and declarative documentationTsekynivska PV Plant 2 3 Stage
- Environmental Impact Assessment (EIA) DocumentsTsekynivska PV Plant 2 3 Stage
- Feed-In-Tariff Setting DocumentsTsekynivska PV Plant 2 3 Stage
The presented list reflects the directions in which information on assets is collected. On the Tsekynivska PV Plant 2 3 Stage some of this information may not yet be available, however, work is underway to collect the missing information and expand the amount of information provided to customers of a subscription.
Have ideas to improve energo.ua?
Energo.ua project is dedicated to add transparancy to Ukrainian renewable energy market.