Description of the power plant
Hydroelectric power plant Uladivska HPP is located in east part of Ukraine - Litynskyi district, Vinnytska region, Ukraine. The power plant is putted into operation on 2017 with installed capacity- 0.18 MW. Ltd "Ukrhidro 2009" is a legal entity operating the power plant. It obtained the license for electricity generation on December 22, 2016 and permitted for the Feed-in-tariff in hryvnias equivalent of 17.45 eurocents starting from May 25, 2017.
Putted into opperation
Apr 2017
Installed capacity
0.18 MW
Feed-in-Tariff
17.45¢
+10% bonusLocation
Key Indicators
Capacity Factor
The unitless ratio of an actual electrical energy output over a given period of time to the maximum possible electrical energy output over that period.
Installed capacity
Installed capacity of the power plant (MW)
Tariff
Tariff established by NERC taking into account the premium for the local component - 10%
(eurocents/KWh)
Contractors
General contractor
LTD "VSEM"Additional information
In a paid subscription, you can additionally find answers to the following questions:
- What phone and email for contacts with Uladivska HPP?
- What group of companies does the Uladivska HPP belong to?
- Who are the beneficial owners of Uladivska HPP?
- What is the current tariff in UAH for Uladivska HPP?
- Is there a local component bonus for Uladivska HPP and what is its size
- What is the capacity factor of Uladivska HPP?
- What is the monthly electricity production of Uladivska HPP?
- What is the annual revenue of Uladivska HPP?
- What market share does Uladivska HPP have in the Ukrainian renewable energy market in terms of capacity, production and revenue?
- What was the capital expenditure cost for Uladivska HPP?
- Which company designed the project for Uladivska HPP?
- Which company was the general contractor for Uladivska HPP?
- What is the size of the land plot on which Uladivska HPP is located?
- What are the cadastral numbers of the parcels on which Uladivska HPP is located?
- What are the exact coordinates of the location of Uladivska HPP?
- When were the grid connection specification forUladivska HPP issued and what capacity was approved in the specification?
In addition, with a paid subscription, you can familiarize yourself with the available permits for Uladivska HPP
- Land allocation documentationUladivska HPP
- Construction permits and declarative documentationUladivska HPP
- Environmental Impact Assessment (EIA) DocumentsUladivska HPP
- Feed-In-Tariff Setting DocumentsUladivska HPP
The presented list reflects the directions in which information on assets is collected. On the Uladivska HPP some of this information may not yet be available, however, work is underway to collect the missing information and expand the amount of information provided to customers of a subscription.
Have ideas to improve energo.ua?
Energo.ua project is dedicated to add transparancy to Ukrainian renewable energy market.