Description of the power plant
Hydroelectric power plant Velykohayivska HPP is located in west part of Ukraine - Ternopilskyi district, Ternopilska region, Ukraine. The power plant is putted into operation on 2019 with installed capacity- 0.15 MW. Ltd "Os-Nova" is a legal entity operating the power plant. It obtained the license for electricity generation on December 27, 2017 and permitted for the Feed-in-tariff in hryvnias equivalent of 17.45 eurocents starting from July 30, 2019.
Putted into opperation
Apr 2019
Installed capacity
0.15 MW
Feed-in-Tariff
17.45¢
Location
Key Indicators
Capacity Factor
The unitless ratio of an actual electrical energy output over a given period of time to the maximum possible electrical energy output over that period.
Installed capacity
Installed capacity of the power plant (MW)
Tariff
Tariff established by NERC
(eurocents/KWh)
Contractors
Designer
LTD "VSEM"General contractor
LTD "OS-NOVA"Additional information
In a paid subscription, you can additionally find answers to the following questions:
- What phone and email for contacts with Velykohayivska HPP?
- What group of companies does the Velykohayivska HPP belong to?
- Who are the beneficial owners of Velykohayivska HPP?
- What is the current tariff in UAH for Velykohayivska HPP?
- Is there a local component bonus for Velykohayivska HPP and what is its size
- What is the capacity factor of Velykohayivska HPP?
- What is the monthly electricity production of Velykohayivska HPP?
- What is the annual revenue of Velykohayivska HPP?
- What market share does Velykohayivska HPP have in the Ukrainian renewable energy market in terms of capacity, production and revenue?
- What was the capital expenditure cost for Velykohayivska HPP?
- Which company designed the project for Velykohayivska HPP?
- Which company was the general contractor for Velykohayivska HPP?
- What is the size of the land plot on which Velykohayivska HPP is located?
- What are the cadastral numbers of the parcels on which Velykohayivska HPP is located?
- What are the exact coordinates of the location of Velykohayivska HPP?
- When were the grid connection specification forVelykohayivska HPP issued and what capacity was approved in the specification?
In addition, with a paid subscription, you can familiarize yourself with the available permits for Velykohayivska HPP
- Land allocation documentationVelykohayivska HPP
- Construction permits and declarative documentationVelykohayivska HPP
- Environmental Impact Assessment (EIA) DocumentsVelykohayivska HPP
- Feed-In-Tariff Setting DocumentsVelykohayivska HPP
The presented list reflects the directions in which information on assets is collected. On the Velykohayivska HPP some of this information may not yet be available, however, work is underway to collect the missing information and expand the amount of information provided to customers of a subscription.
Have ideas to improve energo.ua?
Energo.ua project is dedicated to add transparancy to Ukrainian renewable energy market.