Description of the power plant
Hydroelectric power plant Velykokyriyivska HPP is located in east part of Ukraine - Bershadskyi district, Vinnytska region, Ukraine. The power plant is putted into operation on 2014 with installed capacity- 0.11 MW. Ltd "Podilska Enerhetychna Kompaniya" is a legal entity operating the power plant. It obtained the license for electricity generation on March 04, 2010 and permitted for the Feed-in-tariff in hryvnias equivalent of 19.39 eurocents starting from December 25, 2014.
Putted into opperation
Dec 2014
Installed capacity
0.11 MW
Feed-in-Tariff
19.39¢
Location
Key Indicators
Capacity Factor
The unitless ratio of an actual electrical energy output over a given period of time to the maximum possible electrical energy output over that period.
Installed capacity
Installed capacity of the power plant (MW)
Tariff
Tariff established by NERC
(eurocents/KWh)
Contractors
General contractor
LTD "BERSHADBUD"Additional information
In a paid subscription, you can additionally find answers to the following questions:
- What phone and email for contacts with Velykokyriyivska HPP?
- What group of companies does the Velykokyriyivska HPP belong to?
- Who are the beneficial owners of Velykokyriyivska HPP?
- What is the current tariff in UAH for Velykokyriyivska HPP?
- Is there a local component bonus for Velykokyriyivska HPP and what is its size
- What is the capacity factor of Velykokyriyivska HPP?
- What is the monthly electricity production of Velykokyriyivska HPP?
- What is the annual revenue of Velykokyriyivska HPP?
- What market share does Velykokyriyivska HPP have in the Ukrainian renewable energy market in terms of capacity, production and revenue?
- What was the capital expenditure cost for Velykokyriyivska HPP?
- Which company designed the project for Velykokyriyivska HPP?
- Which company was the general contractor for Velykokyriyivska HPP?
- What is the size of the land plot on which Velykokyriyivska HPP is located?
- What are the cadastral numbers of the parcels on which Velykokyriyivska HPP is located?
- What are the exact coordinates of the location of Velykokyriyivska HPP?
- When were the grid connection specification forVelykokyriyivska HPP issued and what capacity was approved in the specification?
In addition, with a paid subscription, you can familiarize yourself with the available permits for Velykokyriyivska HPP
- Land allocation documentationVelykokyriyivska HPP
- Construction permits and declarative documentationVelykokyriyivska HPP
- Environmental Impact Assessment (EIA) DocumentsVelykokyriyivska HPP
- Feed-In-Tariff Setting DocumentsVelykokyriyivska HPP
The presented list reflects the directions in which information on assets is collected. On the Velykokyriyivska HPP some of this information may not yet be available, however, work is underway to collect the missing information and expand the amount of information provided to customers of a subscription.
Have ideas to improve energo.ua?
Energo.ua project is dedicated to add transparancy to Ukrainian renewable energy market.