Description of the power plant
Ground-based solar power plant Vinkovetska PV Plant 2 Stage is located in west part of Ukraine - Vinkovetskyi district, Khmelnytska region, Ukraine. The power plant is putted into operation on 2018 with installed capacity- 3.18 MW. Ltd "Althen" is a legal entity operating the power plant. It obtained the license for electricity generation on January 18, 2017 and permitted for the Feed-in-tariff in hryvnias equivalent of 15.03 eurocents starting from December 21, 2018.
Putted into opperation
Dec 2018
Installed capacity
3.18 MW
DCFeed-in-Tariff
15.03¢
Location
Key Indicators
Capacity Factor
The unitless ratio of an actual electrical energy output over a given period of time to the maximum possible electrical energy output over that period.
Irradiation
Average annual sum of global irradiation per square meter received by the modules of the given system based on satellite data (kWh/m2)
Tariff
Tariff established by NERC
(eurocents/KWh)
Contractors
Designer
PE "EKONOMENERHO-VM"General contractor
KMP "MONOLIT"Additional information
In a paid subscription, you can additionally find answers to the following questions:
- What phone and email for contacts with Vinkovetska PV Plant 2 Stage?
- What group of companies does the Vinkovetska PV Plant 2 Stage belong to?
- Who are the beneficial owners of Vinkovetska PV Plant 2 Stage?
- What is the insolation at Vinkovetska PV Plant 2 Stage?
- What is the current tariff in UAH for Vinkovetska PV Plant 2 Stage?
- Is there a local component bonus for Vinkovetska PV Plant 2 Stage and what is its size
- What is the capacity factor of Vinkovetska PV Plant 2 Stage?
- What is the monthly electricity production of Vinkovetska PV Plant 2 Stage?
- What is the annual revenue of Vinkovetska PV Plant 2 Stage?
- What market share does Vinkovetska PV Plant 2 Stage have in the Ukrainian renewable energy market in terms of capacity, production and revenue?
- What was the capital expenditure cost for Vinkovetska PV Plant 2 Stage?
- Which company designed the project for Vinkovetska PV Plant 2 Stage?
- Which company was the general contractor for Vinkovetska PV Plant 2 Stage?
- What generating equipment (solar panels and inverters) is installed in Vinkovetska PV Plant 2 Stage?
- What is the size of the land plot on which Vinkovetska PV Plant 2 Stage is located?
- What are the cadastral numbers of the parcels on which Vinkovetska PV Plant 2 Stage is located?
- What are the exact coordinates of the location of Vinkovetska PV Plant 2 Stage?
- When were the grid connection specification forVinkovetska PV Plant 2 Stage issued and what capacity was approved in the specification?
In addition, with a paid subscription, you can familiarize yourself with the available permits for Vinkovetska PV Plant 2 Stage
- Land allocation documentationVinkovetska PV Plant 2 Stage
- Construction permits and declarative documentationVinkovetska PV Plant 2 Stage
- Environmental Impact Assessment (EIA) DocumentsVinkovetska PV Plant 2 Stage
- Feed-In-Tariff Setting DocumentsVinkovetska PV Plant 2 Stage
The presented list reflects the directions in which information on assets is collected. On the Vinkovetska PV Plant 2 Stage some of this information may not yet be available, however, work is underway to collect the missing information and expand the amount of information provided to customers of a subscription.
Have ideas to improve energo.ua?
Energo.ua project is dedicated to add transparancy to Ukrainian renewable energy market.