Description of the power plant
Hydroelectric power plant Vorozhbyanska HPP is located in north part of Ukraine - Lebedynskyi district, Sumska region, Ukraine. The power plant is putted into operation on 1954 with installed capacity- 0.4 MW. Ltd "Yedynyy Enerhostandart" is a legal entity operating the power plant. It obtained the license for electricity generation on August 14, 2018 and permitted for the Feed-in-tariff in hryvnias equivalent of 13.95 eurocents starting from January 11, 2019.
From January 2019 Malo Vorozhbyanska HPP was changed to Vorozhbyanska HPP
Putted into opperation
Dec 1954
Installed capacity
0.4 MW
Feed-in-Tariff
13.95¢
Location
Key Indicators
Capacity Factor
The unitless ratio of an actual electrical energy output over a given period of time to the maximum possible electrical energy output over that period.
Installed capacity
Installed capacity of the power plant (MW)
Tariff
Tariff established by NERC
(eurocents/KWh)
Additional information
In a paid subscription, you can additionally find answers to the following questions:
- What phone and email for contacts with Vorozhbyanska HPP?
- What group of companies does the Vorozhbyanska HPP belong to?
- Who are the beneficial owners of Vorozhbyanska HPP?
- What is the current tariff in UAH for Vorozhbyanska HPP?
- Is there a local component bonus for Vorozhbyanska HPP and what is its size
- What is the capacity factor of Vorozhbyanska HPP?
- What is the monthly electricity production of Vorozhbyanska HPP?
- What is the annual revenue of Vorozhbyanska HPP?
- What market share does Vorozhbyanska HPP have in the Ukrainian renewable energy market in terms of capacity, production and revenue?
- What was the capital expenditure cost for Vorozhbyanska HPP?
- Which company designed the project for Vorozhbyanska HPP?
- Which company was the general contractor for Vorozhbyanska HPP?
- What is the size of the land plot on which Vorozhbyanska HPP is located?
- What are the cadastral numbers of the parcels on which Vorozhbyanska HPP is located?
- What are the exact coordinates of the location of Vorozhbyanska HPP?
- When were the grid connection specification forVorozhbyanska HPP issued and what capacity was approved in the specification?
In addition, with a paid subscription, you can familiarize yourself with the available permits for Vorozhbyanska HPP
- Land allocation documentationVorozhbyanska HPP
- Construction permits and declarative documentationVorozhbyanska HPP
- Environmental Impact Assessment (EIA) DocumentsVorozhbyanska HPP
- Feed-In-Tariff Setting DocumentsVorozhbyanska HPP
The presented list reflects the directions in which information on assets is collected. On the Vorozhbyanska HPP some of this information may not yet be available, however, work is underway to collect the missing information and expand the amount of information provided to customers of a subscription.
Have ideas to improve energo.ua?
Energo.ua project is dedicated to add transparancy to Ukrainian renewable energy market.