Description of the power plant
Onshore wind farm Wind Farm Kramatorska 2 Phase is located in east part of Ukraine - Kramatorska city council, Donetska region, Ukraine. The power plant is putted into operation on 2019 with installed capacity- 4.5 MW. Ltd "Av-K" is a legal entity operating the power plant. It obtained the license for electricity generation on March 14, 2019 and permitted for the Feed-in-tariff in hryvnias equivalent of 10.18 eurocents starting from July 25, 2019.
Putted into opperation
Jul 2019
Installed capacity
4.5 MW
Feed-in-Tariff
10.18¢
+10% bonusLocation
Key Indicators
Capacity Factor
The unitless ratio of an actual electrical energy output over a given period of time to the maximum possible electrical energy output over that period.
Wind speed
Average annual wind speed for 10% windiest areas in 10 km area around wind farm location based on satellite data (m/s)
Tariff
Tariff established by NERC taking into account the premium for the local component - 10%
(eurocents/KWh)
Contractors
Designer
"AVTOHRAF-N"General contractor
LTD "STROYUKOM"Additional information
In a paid subscription, you can additionally find answers to the following questions:
- What phone and email for contacts with Wind Farm Kramatorska 2 Phase?
- What group of companies does the Wind Farm Kramatorska 2 Phase belong to?
- Who are the beneficial owners of Wind Farm Kramatorska 2 Phase?
- What is the wind speed at Wind Farm Kramatorska 2 Phase?
- What is the current tariff in UAH for Wind Farm Kramatorska 2 Phase?
- Is there a local component bonus for Wind Farm Kramatorska 2 Phase and what is its size
- What is the capacity factor of Wind Farm Kramatorska 2 Phase?
- What is the monthly electricity production of Wind Farm Kramatorska 2 Phase?
- What is the annual revenue of Wind Farm Kramatorska 2 Phase?
- What market share does Wind Farm Kramatorska 2 Phase have in the Ukrainian renewable energy market in terms of capacity, production and revenue?
- What was the capital expenditure cost for Wind Farm Kramatorska 2 Phase?
- Which company designed the project for Wind Farm Kramatorska 2 Phase?
- Which company was the general contractor for Wind Farm Kramatorska 2 Phase?
- What generating equipment (wind turbines) is installed in Wind Farm Kramatorska 2 Phase?
- What is the size of the land plot on which Wind Farm Kramatorska 2 Phase is located?
- What are the cadastral numbers of the parcels on which Wind Farm Kramatorska 2 Phase is located?
- What are the exact coordinates of the location of Wind Farm Kramatorska 2 Phase?
- When were the grid connection specification forWind Farm Kramatorska 2 Phase issued and what capacity was approved in the specification?
In addition, with a paid subscription, you can familiarize yourself with the available permits for Wind Farm Kramatorska 2 Phase
- Land allocation documentationWind Farm Kramatorska 2 Phase
- Construction permits and declarative documentationWind Farm Kramatorska 2 Phase
- Environmental Impact Assessment (EIA) DocumentsWind Farm Kramatorska 2 Phase
- Feed-In-Tariff Setting DocumentsWind Farm Kramatorska 2 Phase
The presented list reflects the directions in which information on assets is collected. On the Wind Farm Kramatorska 2 Phase some of this information may not yet be available, however, work is underway to collect the missing information and expand the amount of information provided to customers of a subscription.
Have ideas to improve energo.ua?
Energo.ua project is dedicated to add transparancy to Ukrainian renewable energy market.