Description of the power plant
Onshore wind farm Wind Farm Yuzhne Enerdzhi is located in south part of Ukraine - Lymanskyi district, Odeska region, Ukraine. The power plant is putted into operation on 2021 with installed capacity- 76.5 MW. Ltd "Yuzhne Enerdzhi" is a legal entity operating the power plant. It obtained the license for electricity generation on August 06, 2021 and permitted for the Feed-in-tariff in hryvnias equivalent of 8.82 eurocents starting from August 11, 2021.
Putted into opperation
Jul 2021
Installed capacity
76.5 MW
Feed-in-Tariff
8.82¢
Location
Key Indicators
Capacity Factor
The unitless ratio of an actual electrical energy output over a given period of time to the maximum possible electrical energy output over that period.
Wind speed
Average annual wind speed for 10% windiest areas in 10 km area around wind farm location based on satellite data (m/s)
Tariff
Tariff established by NERC
(eurocents/KWh)
Contractors
Designer
LTD "AHRO-INZHYNIRYNH"General contractor
LTD "NTK "METROPOLIYA"Additional information
In a paid subscription, you can additionally find answers to the following questions:
- What phone and email for contacts with Wind Farm Yuzhne Enerdzhi?
- What group of companies does the Wind Farm Yuzhne Enerdzhi belong to?
- Who are the beneficial owners of Wind Farm Yuzhne Enerdzhi?
- What is the wind speed at Wind Farm Yuzhne Enerdzhi?
- What is the current tariff in UAH for Wind Farm Yuzhne Enerdzhi?
- Is there a local component bonus for Wind Farm Yuzhne Enerdzhi and what is its size
- What is the capacity factor of Wind Farm Yuzhne Enerdzhi?
- What is the monthly electricity production of Wind Farm Yuzhne Enerdzhi?
- What is the annual revenue of Wind Farm Yuzhne Enerdzhi?
- What market share does Wind Farm Yuzhne Enerdzhi have in the Ukrainian renewable energy market in terms of capacity, production and revenue?
- What was the capital expenditure cost for Wind Farm Yuzhne Enerdzhi?
- Which company designed the project for Wind Farm Yuzhne Enerdzhi?
- Which company was the general contractor for Wind Farm Yuzhne Enerdzhi?
- What generating equipment (wind turbines) is installed in Wind Farm Yuzhne Enerdzhi?
- What is the size of the land plot on which Wind Farm Yuzhne Enerdzhi is located?
- What are the cadastral numbers of the parcels on which Wind Farm Yuzhne Enerdzhi is located?
- What are the exact coordinates of the location of Wind Farm Yuzhne Enerdzhi?
- When were the grid connection specification forWind Farm Yuzhne Enerdzhi issued and what capacity was approved in the specification?
In addition, with a paid subscription, you can familiarize yourself with the available permits for Wind Farm Yuzhne Enerdzhi
- Land allocation documentationWind Farm Yuzhne Enerdzhi
- Construction permits and declarative documentationWind Farm Yuzhne Enerdzhi
- Environmental Impact Assessment (EIA) DocumentsWind Farm Yuzhne Enerdzhi
- Feed-In-Tariff Setting DocumentsWind Farm Yuzhne Enerdzhi
The presented list reflects the directions in which information on assets is collected. On the Wind Farm Yuzhne Enerdzhi some of this information may not yet be available, however, work is underway to collect the missing information and expand the amount of information provided to customers of a subscription.
Have ideas to improve energo.ua?
Energo.ua project is dedicated to add transparancy to Ukrainian renewable energy market.