Description of the power plant
Ground-based solar power plant Zhurakivska PV Plant is located in west part of Ukraine - Bohorodchanskyi district, Ivano-Frankivska region, Ukraine. The power plant is putted into operation on 2019 with installed capacity- 0.69 MW. Ltd "Zhurakivska Ses" is a legal entity operating the power plant. It obtained the license for electricity generation on August 30, 2019 and permitted for the Feed-in-tariff in hryvnias equivalent of 15.03 eurocents starting from September 06, 2019.
Putted into opperation
Jul 2019
Installed capacity
0.69 MW
DCFeed-in-Tariff
15.03¢
Location
Key Indicators
Capacity Factor
The unitless ratio of an actual electrical energy output over a given period of time to the maximum possible electrical energy output over that period.
Irradiation
Average annual sum of global irradiation per square meter received by the modules of the given system based on satellite data (kWh/m2)
Tariff
Tariff established by NERC
(eurocents/KWh)
Contractors
Designer
LTD "STEM SOLAR"General contractor
LTD "STEM SOLAR"Additional information
In a paid subscription, you can additionally find answers to the following questions:
- What phone and email for contacts with Zhurakivska PV Plant?
- What group of companies does the Zhurakivska PV Plant belong to?
- Who are the beneficial owners of Zhurakivska PV Plant?
- What is the insolation at Zhurakivska PV Plant?
- What is the current tariff in UAH for Zhurakivska PV Plant?
- Is there a local component bonus for Zhurakivska PV Plant and what is its size
- What is the capacity factor of Zhurakivska PV Plant?
- What is the monthly electricity production of Zhurakivska PV Plant?
- What is the annual revenue of Zhurakivska PV Plant?
- What market share does Zhurakivska PV Plant have in the Ukrainian renewable energy market in terms of capacity, production and revenue?
- What was the capital expenditure cost for Zhurakivska PV Plant?
- Which company designed the project for Zhurakivska PV Plant?
- Which company was the general contractor for Zhurakivska PV Plant?
- What generating equipment (solar panels and inverters) is installed in Zhurakivska PV Plant?
- What is the size of the land plot on which Zhurakivska PV Plant is located?
- What are the cadastral numbers of the parcels on which Zhurakivska PV Plant is located?
- What are the exact coordinates of the location of Zhurakivska PV Plant?
- When were the grid connection specification forZhurakivska PV Plant issued and what capacity was approved in the specification?
In addition, with a paid subscription, you can familiarize yourself with the available permits for Zhurakivska PV Plant
- Land allocation documentationZhurakivska PV Plant
- Construction permits and declarative documentationZhurakivska PV Plant
- Environmental Impact Assessment (EIA) DocumentsZhurakivska PV Plant
- Feed-In-Tariff Setting DocumentsZhurakivska PV Plant
The presented list reflects the directions in which information on assets is collected. On the Zhurakivska PV Plant some of this information may not yet be available, however, work is underway to collect the missing information and expand the amount of information provided to customers of a subscription.
Have ideas to improve energo.ua?
Energo.ua project is dedicated to add transparancy to Ukrainian renewable energy market.